Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8710218

- Product Categories
- Friendly Links
- home > Supply > PE silicon core pipe device silicon core pipe production line Plastic Machinery Co., Ltd., Qingdao Jia Sen
PE silicon core pipe device silicon core pipe production line Plastic Machinery Co., Ltd., Qingdao Jia Sen
Information Name: | PE silicon core pipe device silicon core pipe production line Plastic Machinery Co., Ltd., Qingdao Jia Sen |
Published: | 2013-01-10 |
Validity: | 90 |
Specifications: | PE |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Qingdao of Jia Sen Plastic Machinery Co., Ltd. is located in Shandong plastic machinery production base - Jiaozhou. The company has 19 high-speed conical twin-screw extrusion lines, host for today's world-class equipment, all the production process using automatic computer control. An annual output of 60,000 tons of PE pipes, 30,000 tons of PVC-U pipe is one of the the Northern largest professional plastic manufacturers. Φ20mm-Φ1200mm PE gas pipe to the water pipes, drains Φ20mm-Φ630mmPE main products of the company; PE Plum; 40/33, and other silicon core pipe; 20mm-630mm PUC-U water supply; 200mm-1600mm arm bellows; and supporting the various fittings and pipe. Product specification is fully in line with national standards, some indicators have exceeded the national standard. Able to fully meet the demand for the products of the various industries in various fields at home and abroad. Addition, the company has a sound service system, pre-sale and after-sale tracking service for the corporate philosophy of "integrity, innovation, efficient, first-class, in accordance with standard operation, process form, manage the data of , marketing positions, talent specialization, team humane, image socialization, action militarization "of the requirements of the design, change, and the establishment of a learning organization. Corporate culture shaping people-oriented, customer-centric services in the community, unity, cooperation and innovation. Produce fluid power company with advanced technology, modern management, to provide high-quality products, so that you are satisfied with the service, look forward to sincere cooperation with you blowing compressed air cable machine into the silicon core pipe pipeline, the cables with high-speed airflow suspended silicon core pipe pipeline forward, cable suffered the thrust is uniformly distributed throughout the wear the cabling process. Therefore, no pipe bending arising wear cables difficulties, not limited by the terrain, the cable will not be affected by mechanical damage. (2) the ratio of the cable diameter silicon core pipe inner diameter using the gas blowing laying fiber optic cable, silicon core diameter plastic pipe should be carefully chosen. When the other parameters are determined, the diameter of the pipe and cable laying is proportional to the length of the relationship, that larger diameter, the longer the length of the cable laying. However, In practice, the diameter is too large not only uneconomical, and the air compressor in the rated pressure and displacement, the diameter is too general to reduce the gas pressure in the tube, will not necessarily improve the air blowing laying effect, on the contrary, too small diameter will increase the fiber optic cable and wall friction, and will also reduce the effect of blowing a result, the ratio of the inner diameter of the cable diameter plastic pipe silicon core and generally not less than 2 more suitable. (3) PE silicon core pipe gas blow pipe laying fiber optic cable blowing point (starting point) the laying of fiber optic cable select. For example: in the mountains, laying fiber optic cable in to meet air blowing laying length of premise, should the blowing point selection on the hill, Shun downhill laying fiber optic cable blowing point if there is a major obstacle to be elected at the obstacles before, in the gas laying fiber optic cable blowing the outset through the obstacles, obstacles should not be before the end of the wrap cable, to avoid the last difficult obstacles point. (4) reduce labor intensity, lower construction costs) due to the unique advantages of blowing cable, the wear cable length comparable traction increased by 10 times, greatly reducing the labor intensity. 2) when expansion or maintenance, can be repeated using the original pipeline re-excavation of the cable trench, human, material savings are obvious. (5) improve the quality of construction blowing cable method does not damage the cables and pipes, to use blowing cable the reduced pipe joints, improve the air tightness of the pipeline and construction quality. (6) Annual Hou construction disposable buried pipeline, whether in spring, summer, autumn and winter according to the needs of the construction, without environmental impact. |
Admin>>>
You are the 12037 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Plastic Machinery Co., Ltd. Qingdao Jia Sen All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 12037 visitor
Copyright ©2025 GuangDong ICP No. 10089450, Plastic Machinery Co., Ltd. Qingdao Jia Sen All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility